Request #18-4

 
Closed

As a summary what we need is the following:

 Detailed line item budget costs associated with building the area as a FPR parking lot to automotive standards on the Kaiser property

    • Planning, entitlements, permitting and engineering costs
    • Site prep, site fill, fill estimates, subgrade requirements, etc.
    • Storm water management costs
    • Electrical and utility work
    • Asphalt, striping, fencing, k-rail, lighting, etc.¬†
    • Landscaping
  • Contingencies included in the Port plan associated with the above for both materials and construction
  • Cost associated with any City or Port assessments for streets, storm water management, etc.
  • Port project management costs (would these be required if AWC manages the project ourselves)
  • We will not need:
    • Costs for rail infrastructure (AWC has excess rail capacity)
    • Costs for utility runs, etc. for a processing building (AWC has excess capacity available)
    • Costs associated with rail infrastructure assessments
  • Other questions:
    • Will the project be required to reimburse the $1.165 costs associated with the Ports 3rd party design costs that are currently being incurred or are those considered to be a sunk cost of the Port.
    • If AWC does a ground lease for the Kaiser property, what would be the costs per acre per month for such a lease.
    • If a ground lease is done and AWC builds the infrastructure, would AWC be allowed to be the terminal operator?
    • What would be the terms of a terminal operations agreement?
    • What per unit credit would AWC get for the wharfage generated through new business generated over the East Blair dock?
    • Would an increase in our MAG be required if AWC was paying for both a ground lease and the property development costs?

Received

January 12, 2018 via email


Departments

None Assigned


Requester

Dennis Matteo

Documents

Public

(loading...)

Staff

Point of Contact

Diane Jordan

Request Closed Public

Fulfilled

The Northwest Seaport Alliance released all of the requested documents.

June 14, 2018, 3:14pm
Document(s) Released Public
Release7_email.pdf
May 17, 2018, 4:01pm
Document(s) Released   Details Public
AEmaleh_Notes_4.pdf
Aelmaleh_Notes_3.pdf
AElmaleh_Notes_5.pdf
AElmaleh_Notes_6.pdf
AElmaleh_Notes_7.pdf
AElmaleh_Notes_8.pdf
AElmaleh_Notes_9.pdf
AEmaleh_Notes_1.pdf
AEmaleh_Notes_2.pdf
May 2, 2018, 3:44pm
Document(s) Released Public
Parcel 77 JD1 OHW.pdf
Port Survey Pre-2017.zip
ROS 200903105001.pdf
April 4, 2018, 2:04pm
Document(s) Released   Details Public
12-8-2017 30% Auto Import Terminal.pdf
Combined plans GD6-5-2 reduced.pdf
Compiled list - Review Comment Responses form Parcel 77 Auto Terminal.xls
GDU Update.pdf
Parcel 77 JD1 OHW.pdf
Review Comment Responses form.xls
March 14, 2018, 4:31pm
Document(s) Released   Details Public
Parcel 77 schedule_1.19.18.pdf
Parcel 77 schedule_10.05.17_reasonable.pdf
Parcel 77 schedule_11.05.17_draft.pdf
Parcel 77 schedule_11.05.17_inspirational.pdf
Parcel 77 schedule_11.05.17baseline.pdf
Parcel 77 schedule_11.10.17_baseline.pdf
Parcel 77 schedule_11.13.17baseline.pdf
Parcel 77 schedule_11.17.17baseline.pdf
Parcel 77 schedule_7.31.17.pdf
Parcel 77 schedule_9.18.17.pdf
Parcel 77 schedule_9.22.17.pdf
Parcel 77 Summary schedule_10.05.17.pdf
Parcel 77 Summary schedule_9.28.17.pdf
March 14, 2018, 4:30pm
Document(s) Released   Details Public
2017.11.20 Sign-in Sheet-Kickoff Meeting.docx
Action Items Register Auto Terminal.pdf
Action Items Register Auto Terminal.xlsx
Parcel 77 PreApp Mtg with the City 12-20-17-jn.docx
PMP_auto terminal.kick_off meeting.docx
PMP_auto terminal.pdf
March 14, 2018, 4:30pm
Document(s) Released   Details Public
11/7/2017 Managing Member Meeting Agenda
http://portal.veconnect.us/p/nwseaportalliance/e/9d6a51b1be3c7ddafc978ecad240dfc5
1171011 NIssan Opportunity Auto LOB Revenue Streams MAG and Business Plan Updated 10.pdf
171003 Term Sheet Comparison.pdf
171005 NIssan Opportunity Auto LOB Revenue Streams Updated 8.pdf
171009 WWL Shared Risk Analysis.pdf
171010 NIssan Opportunity Auto LOB Revenue Streams MAG and Business Plan Updated 9.pdf
Commission memos.pdf
March 1, 2018, 3:42pm
Document(s) Released Public
Budget-Projections.pdf
Notes_AElmaleh_WWL.pdf
February 13, 2018, 3:33pm
Document(s) Released   Details Public
161026 NWSA RR BB Draft EB1 alt eval.docx.b980pce.partial
161128 NWSA Study Binder_DRAFT.pdf
161128 NWSA RR BB Draft Exec Summary.docx
2016 Non-container Plan (May).docx
Email.pdf
Kaiser Site 2016 RFI DRAFT COPY (9-22-16) .docx
January 22, 2018, 10:46am
Request Opened Public
Request received via email
January 22, 2018, 10:39am